Detail DT 3.2. - Top of Partition - Dowel

Structural - Detail DT 3.2. Image
Structural - Detail DT 3.2. Image

  • DOWEL SPACING COINCIDES WITH VERTICAL REINFORCEMENT
  • DOWEL FASTENED INTO SLAB WITH INSERTS OR DRILLED HOLE
  • DOWEL INCLOSED IN SLEEVE IN GROUTED CELL
  • BOND BEAM IN THE SECOND LAST COURSE TO ALLOW SPACE FOR GROUTING
  • FIRE STOPPING / SOUND PROOFING MAY BE REQUIRED AT TOP OF WALL TO CLOSE DEFLECTION SPACE